Florid Department of Transportation FDOT emblem

Misting Direct had manufactured and installed a high pressure humidification system at the FDOT Concrete Testing Facility

Misting Direct had manufactured and installed a high pressure humidification system at the FDOT Concrete Testing Facility

This custom designed system runs 24 hour a day 7 days a week allowing the concrete to cure in optimal conditions before the materials are tested for strength.




Leave a Reply

Your email address will not be published.